Skip to main content

Planning – Application Summary

Help with this page (opens in a new window)

21/CON/00038 | Consultation from SCC re Installation of a Steam Methane Reformation (SMR) unit for the production of hydrogen from methane extracted from Albury wellsite including: compressor unit, surge tank, nitrogen supply tank and electrical module and a tanker loading area on some 0.5 hectares, and use of the access track for export of the hydrogen for a temporary period with restoration to commercial forestry. | Albury Park Wellsite, East of New Road, Albury
Reference 21/CON/00038
Alternative Reference Not Available
Application Received Thu 12 Aug 2021
Application Validated Thu 12 Aug 2021
Address Albury Park Wellsite, East of New Road, Albury
Proposal Consultation from SCC re Installation of a Steam Methane Reformation (SMR) unit for the production of hydrogen from methane extracted from Albury wellsite including: compressor unit, surge tank, nitrogen supply tank and electrical module and a tanker loading area on some 0.5 hectares, and use of the access track for export of the hydrogen for a temporary period with restoration to commercial forestry.
Status Decided
Decision Not Available
Decision Issued Date Fri 10 Sep 2021
Appeal Decision Not Available

There are 39 documents associated with this application.

There are 0 cases associated with this application.

There is 1 property associated with this application.

an Idox solution

© - Guildford Borough Council