Skip to main content

Planning – Planning Application Documents

Help with this page (opens in a new window)

19/P/02223 | Hybrid (part full/part outline) application comprising: Full planning permission for 220 residential dwellings (Use Class C3) with associated open space and landscaping, means of access, parking, drainage, utilities and infrastructure works, temporary acoustic fencing, and other associated works; and Outline planning permission, with all matters reserved except for access, for up to 300 residential dwellings (Use Class C3) and Travelling Showpeople plots (Sui Generis) with associated open space and landscaping (including a landscape bund and acoustic fencing), means of access, enabling infrastructure and other associated works. (Amended plans received 18.03.2020 for design, layout, parking of phase 1 and location of custom build homes in outline) | Land at Garlicks Arch, Send Marsh/Burnt Common, Portsmouth Road, Send

You can select up to 25 documents to download in one archive file at a time.

Date Published Document Type Drawing Number Description View
20 Dec 2019 Application Document Cover letter View document icon
20 Dec 2019 Application Document Affordable housing statement View document icon
20 Dec 2019 Application Document Agricultural land assessment View document icon
20 Dec 2019 Application Document Ndss schedule (19201) View document icon
20 Dec 2019 Application Document Arboricultural impact assessment & method statement View document icon
20 Dec 2019 Application Document Tree survey View document icon
20 Dec 2019 Application Document Woodland management plan View document icon
20 Dec 2019 Application Document Woodland report View document icon
20 Dec 2019 Application Document Geophysical survey report View document icon
20 Dec 2019 Application Document Landscape and biodiversity management strategy View document icon
20 Dec 2019 Application Document Schedule of accommodation - phase 1 View document icon
20 Dec 2019 Application Document Supplementary information template View document icon
20 Dec 2019 Application Document Ground contamination preliminary risk assessment: issue 2 View document icon
20 Dec 2019 Application Document Site waste management plan View document icon
20 Dec 2019 Application Document Socio-economic statement View document icon
20 Dec 2019 Application Document Statement of community involvement View document icon
20 Dec 2019 Application Document Utilities statement View document icon
10 Jan 2020 Application Form Application form View document icon
15 Jan 2020 Application Document Drawing issue sheet (13.01.2020) View document icon
15 Jan 2020 Application Document Design and access statement. rev a View document icon
15 Jan 2020 Application Document Design and access statement landscape. rev a View document icon
15 Jan 2020 Application Document Letter: amended phase 1 eia summary (revision to phase 1 boundary) View document icon
23 Jan 2020 Application Document Energy statement View document icon
23 Jan 2020 Application Document Planning statement (final) View document icon
23 Jan 2020 Application Document Sustainability statement View document icon
21 Aug 2019 Application Document Report of guildford design review panel View document icon
20 Nov 2019 Application Document Report of guildford design review panel View document icon
28 Jan 2020 Correspondence Surrey police comment View document icon
28 Jan 2020 Correspondence Parks development officer View document icon
30 Jan 2020 Correspondence James allen View document icon
29 Jan 2020 Correspondence Historic england View document icon
29 Jan 2020 Correspondence Mr orchard View document icon
31 Jan 2020 Correspondence Scc suds View document icon
31 Jan 2020 Correspondence Housing manager View document icon
31 Jan 2020 Correspondence W clandon pc a247 traffic mitigation letter View document icon
06 Feb 2020 Correspondence Niall brunker View document icon
10 Feb 2020 Correspondence Thames water View document icon
07 Feb 2020 Correspondence Scc highways View document icon
10 Feb 2020 Correspondence Mr theodore wallace View document icon
07 Feb 2020 Correspondence Roger newland objects View document icon
07 Feb 2020 Correspondence Highways england View document icon
10 Feb 2020 Correspondence Cameron brown View document icon
10 Feb 2020 Correspondence Guildford society comment View document icon
12 Feb 2020 Correspondence Ockham parish council View document icon
12 Feb 2020 Correspondence Scc archaeologist View document icon
13 Feb 2020 Correspondence East and west clandon residents assn. View document icon
13 Feb 2020 Correspondence Scc minerals & waste comment View document icon
13 Feb 2020 Correspondence Alastair cameron objects View document icon
14 Feb 2020 Correspondence Mike hurdle objects View document icon
14 Feb 2020 Correspondence Scc highways View document icon
18 Feb 2020 Correspondence Dr irene francois View document icon
18 Feb 2020 Correspondence Dr vincent francois View document icon
18 Feb 2020 Correspondence West clandon parish council View document icon
18 Feb 2020 Correspondence C r woodland View document icon
19 Feb 2020 Correspondence Ockham and hatchford residents association View document icon
19 Feb 2020 Correspondence V woodland View document icon
20 Feb 2020 Correspondence Mr s wright View document icon
20 Feb 2020 Correspondence S wright View document icon
20 Feb 2020 Correspondence K gervasio View document icon
24 Feb 2020 Correspondence Mr keith brothwell View document icon
20 Feb 2020 Correspondence Mr joe gervasio View document icon
21 Feb 2020 Correspondence Norah johnson View document icon
21 Feb 2020 Correspondence Alison johnson View document icon
21 Feb 2020 Correspondence Woodland trust View document icon
21 Feb 2020 Correspondence Lucy starke View document icon
24 Feb 2020 Correspondence Susan thompson View document icon
24 Feb 2020 Correspondence Recycling View document icon
24 Feb 2020 Correspondence Environmental health comment View document icon
25 Feb 2020 Correspondence Natural england letter View document icon
25 Feb 2020 Correspondence Send & ripley pcs cover letter View document icon
25 Feb 2020 Correspondence Send & ripley pcs response View document icon
25 Feb 2020 Correspondence Send pc submission View document icon
25 Feb 2020 Correspondence Ripley pc submission View document icon
25 Feb 2020 Correspondence Ripley - kiln lane comments View document icon
26 Feb 2020 Correspondence Guildford residents association View document icon
20 Feb 2020 Correspondence A h h thomas View document icon
27 Feb 2020 Correspondence G c thomas View document icon
25 Feb 2020 Correspondence Douglas french View document icon
28 Feb 2020 Application Document Additional transport assessment information View document icon
03 Mar 2020 Correspondence David burnett View document icon
04 Mar 2020 Correspondence Woodland trust View document icon
05 Mar 2020 Correspondence Surrey wildlife trust View document icon
11 Mar 2020 Correspondence Woodland trust View document icon
10 Mar 2020 Correspondence National trust View document icon
12 Mar 2020 Correspondence Environmental statement review by nicholas pearson assoc View document icon
13 Mar 2020 Correspondence Sussex and surrey police View document icon
18 Mar 2020 Application Document 19201 - drawing issue sheet 17.03.20 View document icon
19 Mar 2020 Correspondence Forestry commission View document icon
19 Mar 2020 Correspondence Nhs clinical commission group View document icon
20 Mar 2020 Application Document Addendum to d & a View document icon
20 Mar 2020 Correspondence Agents phase 1 update View document icon
27 Mar 2020 Correspondence Stagecoach bus View document icon
24 Mar 2020 Correspondence Lvia report by macfarlane & ass View document icon
30 Mar 2020 Correspondence Surrey police View document icon
02 Apr 2020 Correspondence Surrey wildlife trust View document icon
05 Feb 2020 Correspondence Scc education infastructure cil justification statement View document icon
09 Apr 2020 Correspondence Tree officer View document icon
15 Apr 2020 Application Document Ripley paramics lmvr (2) View document icon
21 Apr 2020 Application Document Environmental statement review comments View document icon
21 Apr 2020 Application Document Appendix 4a environmental statement review View document icon
21 Apr 2020 Application Document Appendix 4b environmental statement review View document icon
21 Apr 2020 Application Document Additional supporting information - ecology View document icon
23 Apr 2020 Correspondence Affinity water View document icon
23 Apr 2020 Correspondence Environment agency View document icon
23 Mar 2020 Correspondence Environment agency View document icon
23 Apr 2020 Application Document Viability assessment report View document icon
24 Apr 2020 Correspondence Tree officer View document icon
24 Apr 2020 Correspondence Cadent & national grid View document icon
24 Apr 2020 Correspondence Woking bc View document icon
07 Apr 2020 Correspondence Ripley pc View document icon
24 Mar 2020 Correspondence Send pc (s106) View document icon
01 Apr 2020 Correspondence West clandon pc (s106) View document icon
01 May 2020 Correspondence Aonb officer View document icon
11 May 2020 Correspondence Network rail View document icon
20 Dec 2019 Drawing 0100 rev a Earthworks proposed levels phase 1 key plan. 0100 rev a View document icon
20 Dec 2019 Drawing 0101 rev a Earthworks proposed levels phase 1 sheet 1. 0101 rev a View document icon
20 Dec 2019 Drawing 0102 rev a Earthworks proposed levels phase 1 sheet 2. 0102 rev a View document icon
20 Dec 2019 Drawing 0103 rev a Earthworks proposed levels phase 1 sheet 3. 0103 rev a View document icon
20 Dec 2019 Drawing 0110 rev a Earthworks profiles phase 1 sheet 1. 0110 rev a View document icon
20 Dec 2019 Drawing 0111 rev a Highways profiles phase 1 sheet 2. 0111 rev a View document icon
20 Dec 2019 Drawing 0115 rev a Highways cross sections phase 1 sheet 1. 0115 rev a View document icon
20 Dec 2019 Drawing 0116 rev a Highways cross sections phase 1 sheet 2. 0116 rev a View document icon
20 Dec 2019 Drawing 0117 rev a Highways cross sections phase 1 sheet 3. 0117 rev a View document icon
20 Dec 2019 Drawing 0118 rev a Highways cross sections phase 1 sheet 4. 0118 rev a View document icon
20 Dec 2019 Drawing 0119 rev a Highways cross sections phase 1 sheet 5. 0119 rev a View document icon
20 Dec 2019 Drawing 0120 rev a Highways cross sections phase 1 sheet 1. 0120 rev a View document icon
20 Dec 2019 Drawing 0121 rev a Highways cross sections phase 1 sheet 2. 0121 rev a View document icon
20 Dec 2019 Drawing 0122 rev a Highways cross sections phase 1 sheet 3. 0122 rev a View document icon
20 Dec 2019 Drawing 0123 rev a Highways cross sections phase 1 sheet 4. 0123 rev a View document icon
20 Dec 2019 Drawing 0124 rev a Highways cross sections phase 1 sheet 5. 0124 rev a View document icon
20 Dec 2019 Drawing 0125 rev a Earthworks cut and fill phase 1 plan. 0125 rev a View document icon
20 Dec 2019 Drawing 0130 rev a Earthworks cut and fill phase 1 plan. 0130 rev a View document icon
20 Dec 2019 Drawing 0135 rev a Highways vehicle tracking fire services plan. 0135 rev a View document icon
20 Dec 2019 Drawing 0136 rev a Highways vehicle tracking refuse services plan. 0136 rev a View document icon
20 Dec 2019 Drawing 0137 rev a Highways vehicle tracking delivery services plan. 0137 rev a View document icon
20 Dec 2019 Drawing 0138 rev a Highways vehicle tracking 4x4 car plan. 0138 rev a View document icon
20 Dec 2019 Drawing 0201 rev a Drainage existing site topography & drainage sitewide plan. 0201 rev a View document icon
20 Dec 2019 Drawing 0202 rev a Drainage flood zones sitewide plan. 0202 rev a View document icon
20 Dec 2019 Drawing 0203 rev a Drainage flood plain compensation plan. 0203 rev a View document icon
20 Dec 2019 Drawing 0225 Drainage details. 0225 View document icon
15 Apr 2020 Drawing 184389-g-001 ref f Proposed pedestrian/cycle improvements (sheet 1 of 7) 184389-g-001 ref f View document icon
15 Apr 2020 Drawing 184389-g-002 ref f Proposed pedestrian/cycle improvements (sheet 2 of 7) 184389-g-002 ref f View document icon
15 Apr 2020 Drawing 184389-g-003 ref f Proposed pedestrian/cycle improvements (sheet 3 of 7) 184389-g-003 ref f View document icon
20 Dec 2019 Drawing 19055/c101 Illustrative coloured sketch masterplan. 19055/c101 View document icon
15 Jan 2020 Drawing 19055 c01 d Land use parameter plan. View document icon
15 Jan 2020 Drawing 19055 c02 d Access and movement parameter plan View document icon
15 Jan 2020 Drawing 19055 c03 d Landscape parameter plan View document icon
15 Jan 2020 Drawing 19055 c04 d Building heights parameter plan View document icon
15 Jan 2020 Drawing 19055 c05 d Density parameter plan View document icon
15 Jan 2020 Drawing 19055 p102 a Site section a-a View document icon
15 Jan 2020 Drawing 19055 p103 a Site section b-b View document icon
20 Dec 2019 Drawing 19055 s102 Existing site layout View document icon
18 Mar 2020 Application Document 19201 Schedule of accommodation 17.3.2020 View document icon
15 Jan 2020 Drawing 19201/c01a Housing mix distribution diagram garlick's arch - countryside View document icon
15 Jan 2020 Drawing 19201/c02a Building heights distribution diagram garlick's arch - countryside View document icon
15 Jan 2020 Drawing 19201/c03a Affordable distribution diagram garlick's arch - countryside View document icon
15 Jan 2020 Drawing 19201/c04a Accessibility distribution diagram garlick's arch - countryside View document icon
15 Jan 2020 Drawing 19201/c05a Materials distribution diagram garlick's arch - countryside View document icon
20 Dec 2019 Drawing 19201/c06 Proposed waste strategy plan - phase 1 garlick's arch, burntcommon View document icon
20 Dec 2019 Drawing 19201/c07 Proposed parking & access strategy plan - phase 1 garlick's arch, burntcommon View document icon
15 Jan 2020 Drawing 19201/c101a Proposed sketch layout plan - phase 1 garlick's arch, burntcommon View document icon
15 Jan 2020 Drawing 19201/c102a Coloured sketch layout on illustrative masterplan garlick's arch, burntcommon View document icon
20 Dec 2019 Drawing 19201/c103 Coloured street elevation a-a, garlick's arcj, burntcommon View document icon
20 Dec 2019 Drawing 19201/c104 Coloured street elevation b-b, garlick's arch, burntcommon View document icon
20 Dec 2019 Drawing 19201/c105 Coloured street elevation c-c, garlick's arch, burntcommon View document icon
20 Dec 2019 Drawing 19201/c106 Coloured street elevation d-f, garlick's arch - countryside View document icon
20 Dec 2019 Drawing 19201/c107 Coloured street elevation g-j, garlick's arch - countryside View document icon
20 Dec 2019 Drawing 19201/c108-115 Coloured sketch perspective - central green, garlick's arch, burntcommon View document icon
18 Mar 2020 Drawing 19201 c201 Superseded phase 1 coloured sketch layout View document icon
09 Apr 2020 Drawing 19201 - c201 rev a Amended phase 1 coloured sketch layout 19201 - c201 rev a View document icon
18 Mar 2020 Drawing 19201 c202 Superseded phase 1 masterplan overlay View document icon
09 Apr 2020 Drawing 19201 - c202 rev a Amended phase 1 masterplan overlay 19201 - c202 rev a View document icon
27 Mar 2020 Drawing 19201 - c203 Amended coloured street elevations a-a 19201 - c203 View document icon
27 Mar 2020 Drawing 19201 - c205 Amended coloured street elevations c-c 19201 - c205 View document icon
27 Mar 2020 Drawing 19201 - c206 Amended coloured street elevations d-d, e-e & f-f 19201 - c206 View document icon
27 Mar 2020 Drawing 19201 - c207 Amended coloured street elevations g-g, h-h & j-j 19201 - c207 View document icon
09 Apr 2020 Drawing 19201 - c208 - c213 Coloured sketch perspectived 19201 - c208 - c213 View document icon
27 Mar 2020 Drawing 19201 - c20 rev a Amended coloured street elevations b-b 19201 - c204 rev a View document icon
15 Jan 2020 Drawing 19201 p101 a Phase 1 site plan View document icon
15 Jan 2020 Drawing 19201 p102 a Site layout masterplan View document icon
20 Dec 2019 Drawing 19201 p110 Plots 188 - 189 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p111 Plots 06-07,09-10,101-102,146-147 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p112 Plots 54 - 56 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p113 Plots 24-25,40-42,59-60,117-118,171-172,169-170 proposed plans and elevations View document icon
15 Jan 2020 Drawing 19201 p114 a Plot 100 & 161 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p115 Plots 180 - 183 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p116 Plots 111 - 113 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p118 Plots 77 - 80 proposed plans (ground & first floor) View document icon
20 Dec 2019 Drawing 19201 p119 Plots 77 - 80 proposed elevations View document icon
20 Dec 2019 Drawing 19201 p120 Plots 14-15,57-58,109-110,114-115,144-145,159-160,174-175,178-179 plans and elev View document icon
15 Jan 2020 Drawing 19201 p121 a Plots 01,05 & 13 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p122 Plots 162,163,166,167,176,177,184-187 & 191 plans and elevations View document icon
20 Dec 2019 Drawing 19201 p123 Plots 168 & 173 plans and elevations View document icon
20 Dec 2019 Drawing 19201 p124 Plots 164 & 190 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p125 Plot 143 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p126 Plots 49-51 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p127 Plots 71-72,88-99 & 107-108 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p128 Plots 85 - 87 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p129 Plots 73-76, 81-84 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p130 Plots 65 & 66 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p131 Plots 11-12,52-53 & 97-98 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p132 Plots 62-64 & 94-96 proposed plans and elevations View document icon
15 Jan 2020 Drawing 19201 p133 a Plots 67-70 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p134 Plots 47-48 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p135 Plots 17-20 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p136 Plots 35-36 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p137 Plots 44-46 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p138 Plots 28-31 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p139 Plots 32-34 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p140 Plots 104-106 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p141 Plots 119, 219 & 220 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p142 Plots 37 & 38 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p143 Plots 90 & 93 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p144 Plots 27 & 43 proposed plans and elevations View document icon
15 Jan 2020 Drawing 19201 p145 a Plot 91 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p146 Plot 92 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p147 Plots 2, 3, 4, 22, 23 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p148 Plot 42 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p149 Plot 116 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p150 Plot 16, 165 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p151 Plot 8, 21, 26, 39, 61, 99, 103 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p152 Plot 192 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p153 Plot 142 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p160 Flat block a (plots 120-141) ground floor plan View document icon
20 Dec 2019 Drawing 19201 p161 Flat block a (plots 120-141) first floor plan View document icon
20 Dec 2019 Drawing 19201 p162 Flat block a (plots 120-141) second floor plan View document icon
20 Dec 2019 Drawing 19201 p163 Flat block a (plots 120-141) roof plan View document icon
20 Dec 2019 Drawing 19201 p164 Flat block a (plots 120-141) elevations (1 of 2) View document icon
20 Dec 2019 Drawing 19201 p165 Flat block a (plots 120-141) elevations (2 of 2) View document icon
20 Dec 2019 Drawing 19201 p166 Flat block b (plots 148 - 158) gf & ff plans View document icon
20 Dec 2019 Drawing 19201 p167 Flat block b (plots 148 - 158) second floor & roof plans View document icon
20 Dec 2019 Drawing 19201 p168 Flat block b (plots 148 - 158) elevations View document icon
20 Dec 2019 Drawing 19201 p171 Flat block c (plots 193 - 204) ground & first floor plans View document icon
20 Dec 2019 Drawing 19201 p172 Flat block c (plots 193 - 204) ground & second floor & roof plans View document icon
20 Dec 2019 Drawing 19201 p173 Flat block c (plots 193 - 204) elevations View document icon
20 Dec 2019 Drawing 19201 p174 Flat block d (plots 205 - 218) proposed ground & 1st floor plans View document icon
20 Dec 2019 Drawing 19201 p175 Flat block d (plots 205 - 218) proposed 2nd floor & roof plans View document icon
20 Dec 2019 Drawing 19201 p176 Flat block d (plots 205 - 218) proposed elevations View document icon
20 Dec 2019 Drawing 19201 p180 Car barns 1 of 2 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p181 Car barns 2 of 2 proposed plans and elevations View document icon
20 Dec 2019 Drawing 19201 p182 Garages, community shelter & substation proposed plans and elevations View document icon
15 Jan 2020 Drawing 19201 p190 Street elevation a-a View document icon
15 Jan 2020 Drawing 19201 p191 Street elevation b-b View document icon
15 Jan 2020 Drawing 19201 p192 Street elevation c-c View document icon
18 Mar 2020 Drawing 19201 p210 House type View document icon
18 Mar 2020 Drawing 19201 p211 House type View document icon
18 Mar 2020 Drawing 19201 p212 House type View document icon
18 Mar 2020 Drawing 19201 p213 House type View document icon
18 Mar 2020 Drawing 19201 p214 House type View document icon
18 Mar 2020 Drawing 19201 p215 House type View document icon
18 Mar 2020 Drawing 19201 p216 Affordable units View document icon
18 Mar 2020 Drawing 19201 p217 Affordable units View document icon
18 Mar 2020 Drawing 19201 p218 Affordable units View document icon
18 Mar 2020 Drawing 19201 p219 Affordable units View document icon
18 Mar 2020 Drawing 19201 p220 Affordable units View document icon
18 Mar 2020 Drawing 19201 p221 Affordable units View document icon
18 Mar 2020 Drawing 19201 p222 Affordable units View document icon
18 Mar 2020 Drawing 19201 p223 Affordable units View document icon
18 Mar 2020 Drawing 19201 p224 Affordable units View document icon
18 Mar 2020 Drawing 19201 p225 Affordable units View document icon
18 Mar 2020 Drawing 19201 p227 House type View document icon
18 Mar 2020 Drawing 19201 p228 House type View document icon
18 Mar 2020 Drawing 19201 p229 House type View document icon
18 Mar 2020 Drawing 19201 p230 House type View document icon
18 Mar 2020 Drawing 19201 p231 House type View document icon
18 Mar 2020 Drawing 19201 p232 House type View document icon
18 Mar 2020 Drawing 19201 p233 House type View document icon
18 Mar 2020 Drawing 19201 p234 House type View document icon
18 Mar 2020 Drawing 19201 p235 Affordable units View document icon
18 Mar 2020 Drawing 19201 p236 House type View document icon
18 Mar 2020 Drawing 19201 p237 Block a ground floor plan View document icon
18 Mar 2020 Drawing 19201 p238 Block a first floor plan View document icon
18 Mar 2020 Drawing 19201 p239 Block a second floor plan View document icon
18 Mar 2020 Drawing 19201 p240 Block a elevations View document icon
18 Mar 2020 Drawing 19201 p241 House type View document icon
18 Mar 2020 Drawing 19201 p242 Fogs plot 29 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p243 Fogs plots 39 &120 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p244 Fogs plots 48 &77 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p245 Fogs plots 95 &98 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p246 Fogs plot 96 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p247 Fogs plot 97 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p248 Fogs plot 112 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p249 Fogs plots 153-154 plans & elevations View document icon
18 Mar 2020 Drawing 19201 p250 19201 - block b ground and first floor plans View document icon
18 Mar 2020 Drawing 19201 p251 19201 - block b second floor plan View document icon
18 Mar 2020 Drawing 19201 p252 19201 - block b elevations View document icon
18 Mar 2020 Drawing 19201 p253 19201 - block d ground & first floor plans View document icon
18 Mar 2020 Drawing 19201 p254 19201 - block d second floor plan View document icon
18 Mar 2020 Drawing 19201 p255 19201 - block d elevations View document icon
18 Mar 2020 Drawing 19201 p256 19201 - block c ground & first floor plans View document icon
18 Mar 2020 Drawing 19201 p257 19201 - block c second floor plan View document icon
18 Mar 2020 Drawing 19201 p258 19201 - block c elevations View document icon
18 Mar 2020 Drawing 19201 p259 House type View document icon
18 Mar 2020 Drawing 19201 p260 Plots 15,16,124,150,164 plans & elevations View document icon
15 Jan 2020 Drawing 19201 s101 g Phase 1 detailed application boundary. s101 e View document icon
15 Jan 2020 Drawing 19201 s102 a Phase 1 existing site layout View document icon
15 Jan 2020 Drawing 19201 sk56 b Phasing plan. 19201 sk56 a View document icon
20 Dec 2019 Drawing Ln-ld-102 rev d Illustrative landscape masterplan. ln-ld-102 rev d View document icon
15 Jan 2020 Drawing Ln-ld-201 rev a Hard & soft landscape strategy sheet 1 of 3. ln-ld-201 rev a View document icon
15 Jan 2020 Drawing Ln-ld-202 rev a Hard & soft landscape strategy sheet 2 of 3. ln-ld-202 rev a View document icon
15 Jan 2020 Drawing Ln-ld-203 rev a Hard & soft landscape strategy sheet 3 of 3. ln-ld-203 rev a View document icon
21 Apr 2020 Application Document Ln-lp-06 rev c Appendix 4c environmental statement review View document icon
21 Apr 2020 Application Document Ln-lp-09 rev a Appendix 4d environmental statement review View document icon
20 Dec 2019 Drawing Lsl22423-01c sheet 1 of 6 Tree survey plan. lsl22423-01c sheet 1 of 6 View document icon
20 Dec 2019 Drawing Lsl22423-01c sheet 2 of 6 Tree survey plan. lsl22423-01c sheet 2 of 6 View document icon
20 Dec 2019 Drawing Lsl22423-01c sheet 3 of 6 Tree survey plan. lsl22423-01c sheet 3 of 6 View document icon
20 Dec 2019 Drawing Lsl22423-01c sheet 4 of 6 Tree survey plan. lsl22423-01c sheet 4 of 6 View document icon
20 Dec 2019 Drawing Lsl22423-01c sheet 5 of 6 Tree survey plan. lsl22423-01c sheet 5 of 6 View document icon
20 Dec 2019 Drawing Lsl22423-01c sheet 6 of 6 Tree survey plan. lsl22423-01c sheet 6 of 6 View document icon
20 Dec 2019 Drawing Lsl22423-01c sheet 7 Tree survey plan. lsl22423-01c sheet 7 View document icon
17 Mar 2020 Drawing Lsl22423-03 rev a sheet 1 of 7 Amended tree protection plan lsl22423-03 rev a sheet 1 of 7 View document icon
17 Mar 2020 Drawing Lsl22423-03 rev a sheet 2 of 7 Amended tree protection plan lsl22423-03 rev a sheet 2 of 7 View document icon
17 Mar 2020 Drawing Lsl22423-03 rev a sheet 3 of 7 Amended tree protection plan lsl22423-03 rev a sheet 3 of 7 View document icon
17 Mar 2020 Drawing Lsl22423-03 rev a sheet 4 of 7 Amended tree protection plan lsl22423-03 rev a sheet 4 of 7 View document icon
17 Mar 2020 Drawing Lsl22423-03 rev a sheet 5 of 7 Amended tree protection plan lsl22423-03 rev a sheet 5 of 7 View document icon
17 Mar 2020 Drawing Lsl22423-03 rev a sheet 6 of 7 Amended tree protection plan lsl22423-03 rev a sheet 6 of 7 View document icon
17 Mar 2020 Drawing Lsl22423-03 rev a sheet 7 of 7 Amended tree protection plan lsl22423-03 rev a sheet 7 of 7 View document icon
20 Dec 2019 Drawing Lsl22423-03 sheet 1 of 7 Tree protection plan. lsl22423-03 sheet 1 of 7 View document icon
20 Dec 2019 Drawing Lsl22423-03 sheet 2 of 7 Tree protection plan. lsl22423-03 sheet 2 of 7 View document icon
20 Dec 2019 Drawing Lsl22423-03 sheet 3 of 7 Tree protection plan. lsl22423-03 sheet 3 of 7 View document icon
20 Dec 2019 Drawing Lsl22423-03 sheet 4 of 7 Tree protection plan. lsl22423-03 sheet 4 of 7 View document icon
20 Dec 2019 Drawing Lsl22423-03 sheet 5 of 7 Tree protection plan. lsl22423-03 sheet 5 of 7 View document icon
20 Dec 2019 Drawing Lsl22423-03 sheet 6 of 7 Tree protection plan. lsl22423-03 sheet 6 of 7 View document icon
20 Dec 2019 Drawing Lsl22423-03 sheet 7 of 7 Tree protection plan. lsl22423-03 sheet 7 of 7 View document icon
20 Dec 2019 Drawing S101 b Location plan. s101 b View document icon
20 Dec 2019 Application Document Volume i Environmental statement - non-technical summary View document icon
20 Dec 2019 Application Document Volume ii Environmental statement - statement of competence View document icon
20 Dec 2019 Application Document Volume ii Environmental statement - contents page View document icon
20 Dec 2019 Application Document Volume ii - chapter 1 Environmental statement - introduction View document icon
20 Dec 2019 Application Document Volume ii - chapter 10 Environmental statement - landscape and visual impact assessment View document icon
20 Dec 2019 Application Document Volume ii - chapter 11 Environmental statement - water resources and flood risk View document icon
20 Dec 2019 Application Document Volume ii - chapter 12 Environmental statement - residual impacts, mitigation and cumulative effects View document icon
20 Dec 2019 Application Document Volume ii - chapter 2 Environmental statement - description of the site, surroundings and background View document icon
20 Dec 2019 Application Document Volume ii - chapter 3 Environmental statement - proposed development and alternative considerations View document icon
20 Dec 2019 Application Document Volume ii - chapter 4 Environmental statement - soils and construction methodology View document icon
20 Dec 2019 Application Document Volume ii - chapter 5 Environmental statement - eia methodology View document icon
20 Dec 2019 Application Document Volume ii - chapter 6 Environmental statement - transport and access View document icon
20 Dec 2019 Application Document Volume ii - chapter 7 Environmental statement - noise and vibration View document icon
20 Dec 2019 Application Document Volume ii - chapter 8 Environmental statement - air quality View document icon
20 Dec 2019 Application Document Volume ii - chapter 9 Environmental statement - ecology and nature conservation View document icon
20 Dec 2019 Application Document Volume iii appendix 1.1 Environmental statement - site location plan View document icon
20 Dec 2019 Application Document Volume iii appendix 1.2 Environmental statement - phasing plan View document icon
20 Dec 2019 Application Document Volume iii appendix 1.3 Environmental statement - glossary of common terms & abbreviations View document icon
20 Dec 2019 Application Document Volume iii appendix 10.1 Environmental statement - lvia methodology View document icon
20 Dec 2019 Application Document Volume iii appendix 10.2 Environmental statement - figures 1-7 View document icon
20 Dec 2019 Application Document Volume iii appendix 10.3 Environmental statement - site appraisal photographs a-n View document icon
20 Dec 2019 Application Document Volume iii appendix 10.4 Environmental statement - landscape effects table View document icon
20 Dec 2019 Application Document Volume iii appendix 10.5 Environmental statement - site context photographs 1-15 View document icon
20 Dec 2019 Application Document Volume iii appendix 10.6 Environmental statement - visual effects table View document icon
20 Dec 2019 Application Document Volume iii appendix 10.7 Environmental statement - photo-montages View document icon
20 Jan 2020 Application Document Volume iii appendix 11.1 Hydraulic modelling report (issue 1) View document icon
20 Jan 2020 Application Document Volume iii appendix 11.1 (issue 2) Environmental statement - flood risk assessment View document icon
20 Dec 2019 Application Document Volume iii appendix 3.1 Environmental statement - parameter plans (access) View document icon
20 Dec 2019 Application Document Volume iii appendix 3.1 Environmental statement - parameter plans (building heights) View document icon
20 Dec 2019 Application Document Volume iii appendix 3.1 Environmental statement - parameter plans (density) View document icon
20 Dec 2019 Application Document Volume iii appendix 3.1 Environmental statement - parameter plans (land use) View document icon
20 Dec 2019 Application Document Volume iii appendix 3.1 Environmental statement - parameter plans (landscape) View document icon
20 Dec 2019 Application Document Volume iii appendix 4.1 Environmental statement - desk-based assessment of agricultural circumstances View document icon
20 Dec 2019 Application Document Volume iii appendix 5.1 Environmental statement - scoping opinion report View document icon
20 Dec 2019 Application Document Volume iii appendix 5.2a Environmental statement - scoping response letter View document icon
20 Dec 2019 Application Document Volume iii appendix 5.2b Environmental statement - response summary table View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix a) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix b) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix c) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix d) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix e) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix f) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix g) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix h) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix i) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix j) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix k) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix l) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix m) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix n) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix o) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix p) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix q) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix r) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix s) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix t) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix u) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix v) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment (appendix w) View document icon
20 Dec 2019 Application Document Volume iii appendix 6.1 Environmental statement - transport assessment View document icon
20 Dec 2019 Application Document Volume iii appendix 6.10 Environmental statement - tempro growth rates View document icon
20 Dec 2019 Application Document Volume iii appendix 6.11 Environmental statement - traffic flows View document icon
20 Dec 2019 Application Document Volume iii appendix 6.12 Environmental statement - highway impact methodology View document icon
20 Dec 2019 Application Document Volume iii appendix 6.13 Environmental statement - traffic flows View document icon
20 Dec 2019 Application Document Volume iii appendix 6.2 Environmental statement - study area View document icon
20 Dec 2019 Application Document Volume iii appendix 6.3 Environmental statement - sustainable transport review View document icon
20 Dec 2019 Application Document Volume iii appendix 6.4 Environmental statement - local amenities View document icon
20 Dec 2019 Application Document Volume iii appendix 6.5 Environmental statement - journey to work analyses View document icon
20 Dec 2019 Application Document Volume iii appendix 6.6 Environmental statement - personal injury collision data View document icon
20 Dec 2019 Application Document Volume iii appendix 6.7 Environmental statement - baseline traffic flows View document icon
20 Dec 2019 Application Document Volume iii appendix 6.8 Environmental statement - trip generation calculations View document icon
20 Dec 2019 Application Document Volume iii appendix 6.9 Environmental statement - traffic distribution diagrams View document icon
20 Dec 2019 Application Document Volume iii appendix 7.1 Environmental statement - noise measurement results View document icon
20 Dec 2019 Application Document Volume iii appendix 7.2 Environmental statement - construction plant assumptions View document icon
20 Dec 2019 Application Document Volume iii appendix 7.3 Environmental statement - traffic flow data View document icon
20 Dec 2019 Application Document Volume iii appendix 7.4 Environmental statement - facade numbering and sound ins View document icon
20 Dec 2019 Application Document Volume iii appendix 7.5 Environmental statement - phase 1 noise mapping View document icon
20 Dec 2019 Application Document Volume iii appendix 7.6 Environmental statement - travelling showpeople noise mapping View document icon
20 Dec 2019 Application Document Volume iii appendix 7.7 Environmental statement - full site noise mapping View document icon
20 Dec 2019 Application Document Volume iii appendix 7.8 Environmental statement - phase 1 bund mapping View document icon
20 Dec 2019 Application Document Volume iii appendix 7.9 Environmental statement - comparison of phase 1 noise levels View document icon
20 Dec 2019 Application Document Volume iii appendix 8.1 Environmental statement - air quality technical appendix View document icon
20 Dec 2019 Application Document Volume iii appendix 9.1 Environmental statement - phase 1 map View document icon
20 Dec 2019 Application Document Volume iii appendix 9.10 Environmental statement - badger field signs survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.11 Environmental statement - otter and water vole survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.12 Environmental statement - hazel dormouse survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.13 Environmental statement - reptile survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.14 Environmental statement - invertebrate scoping survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.15 Environmental statement - woodland nvc survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.16 Environmental statement - rare arable plants survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.17 Environmental statement - surrey wildlife trust consultation View document icon
20 Dec 2019 Application Document Volume iii appendix 9.18 Environmental statement - biodiversity impact calculator - part 1 View document icon
20 Dec 2019 Application Document Volume iii appendix 9.18 Environmental statement - biodiversity impact calculator - part 2 View document icon
20 Dec 2019 Application Document Volume iii appendix 9.18 Environmental statement - biodiversity impact calculator - part 3 View document icon
20 Dec 2019 Application Document Volume iii appendix 9.18 Environmental statement - biodiversity impact calculator - part 4 View document icon
20 Dec 2019 Application Document Volume iii appendix 9.19 Environmental statement - hra/aa informative report View document icon
20 Dec 2019 Application Document Volume iii appendix 9.2 Environmental statement - site photos View document icon
20 Dec 2019 Application Document Volume iii appendix 9.3 Environmental statement - breeding bird survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.4 Environmental statement - wintering bird survey View document icon
20 Dec 2019 Application Document Volume iii appendix 9.5 Environmental statement - bat transect surveys View document icon
20 Dec 2019 Application Document Volume iii appendix 9.6 Environmental statement - bat detector surveys View document icon
20 Dec 2019 Application Document Volume iii appendix 9.7 Environmental statement - bat harp trapping surveys View document icon
20 Dec 2019 Application Document Volume iii appendix 9.8 Environmental statement - bat potential roost features: trees View document icon
20 Dec 2019 Application Document Volume iii appendix 9.9 Environmental statement - bat potential roost features: ground truthing survey View document icon

an Idox solution

© Guildford Borough Council